Medical Architecture All Work
All Work

Simpson House Medical Centre

In order to address the demands of the rising local population, this surgery was reconfigured into a more efficient layout, with a new extension built to the site limits, retaining the existing car park. It was constructed in three phases, which allowed the GP’s to continue to practice throughout the 20-week construction period.