Intensive Care Unit – St. Helier Hospital

This new Intensive Care Unit (ICU) at St. Helier Hospital, designed by Medical Architecture for Epsom and St. Helier University Hospitals NHS Trust, was promptly completed amidst the first wave of Covid-19 infections. The rigorous application of design standards, bed spacing and infection prevention measures allowed the facility to be immediately occupied, helping the Trust to significantly increase its ICU capacity for the treatment of Covid-19 patients.

The previous ICU service at St. Helier occupied a single ward of the original 1930’s hospital building. A CQC inspection identified that improvement was imperative to the future of the hospital, reporting that pressures on the service capacity had led to overcrowding, and that the quality and functionality of clinical space were significantly compromised as a result. The challenge for Medical Architecture was to provide a compliant, well functioning facility within the constraints of an existing infrastructure which pre-dates the NHS. The layout is the result of detailed briefing sessions with the clinical team. The new unit reflects a patient-focused model of care with support space provided around individual bed spaces, which allow the facility to operate seamlessly and efficiently.

The new ICU layout illustrates how well structured collaboration between an architect and an engaged clinical team can improve clinical workflows. While the old ICU exposed the limitations of an outdated building, increasing service demand and pressures on staff, the new ICU facility at St. Helier is now organised around, and reflective of, the current best working practices and the care requirements of patients. This investment in improved infrastructure will also benefit the wider hospital; enabling the future reconfiguration and modernisation of adjacent clinical facilities, as well as reducing running costs.


Location:
London, UK

Sector:
Acute / Critical Care

Client:
Epsom and St. Helier University Hospitals NHS Trust / Artelia

Role:
Architect

Value:
Undisclosed

Status:
Completed May 2020

Linkedin Twitter Email Pinterest Google